Partecipants: A. Del Linz M.Prica, R.Pugliese, David Gutièrrez, Emilio Diaz, Stefano Salon, Elena Mauri, Giorgio Bolzon, Matteo Lanati, Ignacio Coterillo, Maria Del Campo, Alex Cheptsov Ioannis Liabotis

Goal of this meeting is to get an update on the status of the pilot applications, monitor the progress and decide possible corrective actions pilot applications.

Status of the OGS applications - RA is now operating: got certificates, VCR yet to configure

- IM integration is on the way. Floats IM has now basic functionality. INGV Bridge IM is under development

- Alex has already testes the model in a machine offered by PSNC via local queue system, and is now trying to use gLite via command line. Next step will be through the VCR.

Status of the UC application - HORUS_bench will use the VCR installed by CSIC - Ignacio installed the VCR with some problems in the Information System and in the Job submission. Problems have been solved. Andrea is preparing a patch. - Basic Image processing has been developed and tested using gLite via command line. - Next step is to patch the VCR and then test the image processing via VCR.

Status of ELETTRA applications. - We have completed the integration of interactive application fit2d with the VCR - We have now to define the final setup of the SAXS online processing application.

Status of EUCENTER application. - RA is not yet running. We need precise dates as this delays the final VCR setup which prevents access to the DORII infrastructure.

- Porting of the simulation code in C is almost complete. We have now to try submitting the job via VCR.

We have setup an online survey tool to use for the evaluation process (other workpackages can profit). Next meeting next week same day same time. Each partner should define by next monday the list of key users, the list of tasks to perform using the infrastructure and a list of questions able to capture objective and subjective evaluation of the application deployment

Back to top